Porvorim Elevated Corridor Enters Final Load Testing Phase

    Digital Goa, July 28 – The six-lane Porvorim Elevated Corridor has entered its mandatory load testing phase, marking a key milestone as construction of the flyover nears completion. As part of the testing process, multiple heavily loaded trucks are being positioned at designated locations and driven across the bridge to assess its structural performance under simulated traffic loads.