2 Mandovi bridges to be closed for maintenance on Saturday, Dec 9 from 6 am to 9 am

    807
    0

    Digital Goa, Dec 5- PWD has issued order for closure of the Old and New Mandovi Bridge on Saturday, December 9, between 6 am to 9.00 am (total 3 hours) for the maintenance of the bridge. The closure is needed for recording of deck levels of the Old and New Mandovi Bridge on NH-17(66) across river Mandovi, states PWD .During closure of Old Mandovi Bridge the light vehicles are to be diverted via New Mandovi Bridge (Both Ways) and heavy traffic via Atal Setu (Both Ways). Similarly during closure of New Mandovi Bridge heavy traffic is to be diverted via Atal Setu (Both Ways) and light traffic is to be diverted via Old Mandovi Bridge (Both Ways).