Home News Porvorim Elevated Corridor work to commence from Aug 8

Porvorim Elevated Corridor work to commence from Aug 8

370
0

Aug 5 – PWD has notified closure of 2 stretches of road on NH66 for all types of vehicular traffic in view of the construction of six lane Elevated Corridor at Porvorim which is scheduled to commence from Aug 8. The road between Cyrus Nursery to Sangolda Junction, for a length of 175 metres will be closed and traffic will be diverted on both service roads. Similarly the road between Junction near Delfino to Hotel Majestic, for a length of 220 metres will be closed and traffic will be diverted on left hand side service road. The two roads will be closed for all types of vehicular traffic from Aug 8 to Dec 7, to facilitate hindrance free and speedy completion of the work, states the notification.