Aug 4 – The foot bridge which was in the precarious condition at Miramar was finally dismantled today. The work to dismantle the metal foot bridge commenced yesterday. The traffic on the busy Miramar to Dona Paula road was closed for last two days to facilitate the dismantling of footbridge. The Sharada Mandir school which is located adjacent to this bridge had declared holiday yesterday. There was a demand from the public to remove this 12-year-old bridge which was never used. The bridge had turned into a major danger to public safety as it was corroded on all sides.
Sign in
Welcome! Log into your account
Forgot your password? Get help
Password recovery
Recover your password
A password will be e-mailed to you.